BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ChamberMaster//Event Calendar 2.0//EN
METHOD:PUBLISH
X-PUBLISHED-TTL:P3D
REFRESH-INTERVAL:P3D
CALSCALE:GREGORIAN
BEGIN:VEVENT
DTSTART:20190613T140000Z
DTEND:20190613T160000Z
X-MICROSOFT-CDO-ALLDAYEVENT:FALSE
SUMMARY:Pasco County (News Release) Wesley Chapel Roadways Connections Survey
DESCRIPTION:Based on public input\, the MPO conducted a study to evaluate traffic impacts and to identify any necessary improvements\, with or without connections. The potential connections include Mansfield Boulevard and Kinnan Street\; Meadow Pointe Boulevard and Meadow Pointe Boulevard Extension and Wyndfields Boulevard and Wyndfields Boulevard Extension.\n\nPasco County has not made any decisions regarding these connections.\n\n \n\nThe results of the survey will be presented to the MPO Board during their regularly scheduled meeting on June 13\, 2019 from 10 a.m to noon at the Historic Pasco County Courthouse in Dade City\, FL.  The MPO board is expected to make a recommendation to the Board of County Commissioners regarding these connections.\n\n \n\nFor more information including a map of the study area\, click here: bit.ly/WCRoadwayStudy \n\n \n\nFor more information about Pasco County Metropolitan Planning Organization: bit.ly/PascoMPO.
X-ALT-DESC;FMTTYPE=text/html:<span style="font-family:times new roman\,serif\;"><span style="font-size:12.0pt\;">Based on public input\, the MPO conducted a study to evaluate traffic impacts and to identify any necessary improvements\, with or without connections. The potential connections include Mansfield Boulevard and Kinnan Street\; Meadow Pointe Boulevard and Meadow Pointe Boulevard Extension and Wyndfields Boulevard and Wyndfields Boulevard Extension.<br />\nPasco County has not made any decisions regarding these connections.</span></span><br />\n&nbsp\;<br />\n<span style="font-family:times new roman\,serif\;"><span style="font-size:12.0pt\;">The results of the survey will be presented to the MPO Board during their regularly scheduled meeting on June 13\, 2019 from 10 a.m to noon at the Historic Pasco County Courthouse in Dade City\, FL.&nbsp\; The MPO board is expected to make a recommendation to the Board of County Commissioners regarding these connections.</span></span><br />\n&nbsp\;<br />\n<em><span style="font-family:times new roman\,serif\;"><span style="font-size:12.0pt\;">For more information including a map of the study area\, click here: </span></span></em><span style="font-family:times new roman\,serif\;"><span style="font-size:12.0pt\;"><a href="http://bit.ly/WCRoadwayStudy">bit.ly/WCRoadwayStudy</a> </span></span><br />\n&nbsp\;<br />\n<em><span style="font-family:times new roman\,serif\;"><span style="font-size:12.0pt\;">For more information about Pasco County Metropolitan Planning Organization: </span></span></em><span style="font-family:times new roman\,serif\;"><span style="font-size:12.0pt\;"><a href="http://bit.ly/PascoMPO">bit.ly/PascoMPO</a><em>.</em></span></span><br />\n&nbsp\;
LOCATION:Historic Pasco County Courthouse 37918 Meridian Ave\, Dade City\, FL.
UID:e.3315.2492
SEQUENCE:3
DTSTAMP:20260406T192828Z
URL:https://business.eastpascochamber.org/events/details/pasco-county-news-release-wesley-chapel-roadways-connections-survey-2492
END:VEVENT

END:VCALENDAR
